The lifting capacity of Floating Dock 1 is 20.000 tonnes. Floating Dock 1 has 227 m length and 37 m clear width. The dock has 10 tonnes @ 19 m movable hydraulic cranes on each wing wall. Keel block height is 1.65 m and 440 V / 60 Hz can be provided with necessary service lines for vessels.
The lifting capacity of Floating Dock 2 is 25.000 tonnes. Floating Dock 2 has 250 m length and 38 m clear width. The dock has 20 tonnes @ 23 m movable hydraulic cranes on each wing wall. Keel block height is 1.65 m and 440 V / 60 Hz can be provided with necessary service lines for vessels.
Pier 1 has 215 m length and 15 m beam. Pier 1 is equipped with 1 pc 15 tonnes @ 20 m and 2 pcs 8 tonnes @ 63 m cranes.
Pier 2 has 150 m length and 10 m beam. Pier 2 is equipped with 1 pc 10 tonnes crane.
Pier 3 has 239 m length and 15 m beam. Pier 3 is equipped with 1 pc 15 tonnes and 2 pcs 10 tonnes cranes.
Pier 4 has 150 m length and 10 m beam. Pier 4 is equipped with 1 pc 10 tonnes crane.
Slipway 1 has 180 m length, 52 m beam and 1° angle. Vessels are launched via airbags.
Slipway 2 has 170 m length and 25 m beam. Slipway 2 and 3 are sisters and have flat surface. Vessels are launched via floating dock.
Slipway 3 has 170 m length and 28 m beam. Slipway 2 and 3 are sisters and have flat surface. Vessels are launched via floating dock.
Slipway 4 has 200 m length and 65 m beam and 1° angle. Vessels are launched via airbags.
Slipway 5 has 160 m length. Vessels are launched via airbags.
Warehouse 1 has 1.500 m2 closed area for consumables and spare materials.
Warehouse 2 has 3.000 m2 closed area for consumables and spare materials.
Block Production Area has 4.500 m2 closed area. Blocks of the vessels and floating dock are fabricated in this area.
Mechanical and Pipe Workshop 2 has 4.200 m2 closed area. All kind of equipment are able to be overhauled in mechanical workshop. All size of pipes are fabricated according to international standarts.
Paint Hall has 600 m2 closed area. Dimensions of the hall are 30x20x22 m. Up to 28x18 m megablocks are able to blasted and painted in the paint hall.
Chairman, Board, Management, Accounting and Administrative Affairs Departments are located in Head Office building. Several meeting rooms and mess hall are available for customers and yard staff.
New Building Management, Marketing, Planning, Design, Procurement, Quality Control Departments are located in Head Office building.
Repair Management, Marketing, Planning, Design, Procurement, Quality Control Departments are located in Head Office building.
Workshops have 700 m2 closed area. All kind of insulation and outfitting works are able to be done in workshops.
Social Building 1 has 2.600 m2 closed area. New Building and Repair Production Departments are located in this building. Also, several Superintendent offices, meeting rooms and mess hall are located for customers and yard staff.
Social Building 2 has 5.000 m2 closed area. New Building and Repair Production Departments are located in this building. Also, several Superintendent offices and meeting rooms are located for customers and yard staff.
Stock area has 5.000 m2 open storage area for steel plates, profiles and pipes.
Two gates are located at the main entrance of the yard. Yard security office is located at the main gate. Other gate is serving for only yard vehicles.